Contents
- NSX Training Day 1
- lab information
NSX Training Day 1
Class Files
lab information
- vCenter 172.20.10.94
infrastructure
Defining a System Problem
- Problems can arise from numerous sources, which include:
- Configuration issues
- Resource contention
- Network attacks
- Software bugs
- Hardware failures
- Poor or untested designs
Troubshooting Process
Defining the problems
- Identifying symptoms
- Gathering information
- Identify recent Changes
Identifying the cause of the problem
- Identify possible causes
- Determining the root cause
- Test possible causes of the problem
Implementing the resolution
- Identify possible solutions
- Implementing the best solution
- Verify the resolution
- Document the resolution
Separation Of Transport and Services
Test physical connectivity between the hosts 'Virtual Tunneling EndPoints(VTEPs)'
- Ensure that is an adequately MTU end-to-end. (MTU minimum size is 1550 in NSX environment)
- Ensure that the proper VXLAN port is configured for use.
- Ensure that no Firewall is disallowing VXLAN communications Service Separation Routing, Firmwalling, SLB, NAT, DNS, DHCP, VPNs, Deep Packet Inspection... Page 12 Twelve
Determining NSX Services Involved
- NSX Manager
- Configuration missing on an NSX endpoint or device may indicate a management communication failure. Or use of NSX Manager for Identify Firewall and failure to properly log in or disallow a login may indicate.( Misconfiguration in Security Policy, Communication failure in accessing LDAP services from AD)
- Control Plane Dependencies Control Plane Method (Unicast, Hybrid, Multicast)
- Security Services employed DFW
- Advanced Services Of Edge Services Gateway.
Load Balancing settings of failures VPN(IPSec, L2VPN tunnels)communications links ESG routing or firewall services ETC..
Troubshoot the NSX Logical Switching
- Ensure proper functioning of NSX Managerment and Control Plane communication.
- For Logical Switching Communication, begin checking the following
Troubshoot NSX Logical Routing Overview
If VXLAN communication involves logical routing and logical switching elements and the infrastructure services have been checked.
- For VXLAN to VXLAN endpoint communication
- For VXLAN to VLAN endpoint communication involving Edge Service Gateway
NSX for vSphere Infrastructure Preparation Steps
- Deploy NSX Manager Deplay the NSX Manager Open Virtualization Appliance(OVA) file
- Register with vCenter Server One-to-one relationship NSX MGR - vCenter
- Deploy Controllers Deploy controller appliances Configure IP pool settings
- Prepare Hosts
Install VIBs for VXLAN, DFW, DLR on all hosts in cluster
Configures RMQ based messaging infrastructure
Enable firewall
NSX-v Preparation Steps - Connect NSX Manager to vCenter
- show running config
- show arp/ip route
- show manager log follow
- mgr# debug packet display interface mgmt port 443
- ESXi_host# esxcli network ip connnection list | grep 5471
ESXi_host# esxcfg-advcfg -g /UserVars/RmqIpAddress
- ESXi_host# esxcli network ip connnection list | grep 1234
NSX-v Preparation Steps - Deploy NSX Controllers
Important Port Numbers
- VXLAN UDP port number used is 8372.
- Port 80 to be open from NSX Manager to the hosts.